1. Home
  2. Live status
  3. District line

Status: Part Closure

DISTRICT LINE: Saturday 14 and Sunday 15 March, no service between High Street Kensington and Edgware Road. Please use CIRCLE LINE services instead.

Last updated:

Is the District line running today?

As of the evening of 14 March 2026, the District line is not running a full service. Please check the status below for more details.

Details: DISTRICT LINE: Saturday 14 and Sunday 15 March, no service between High Street Kensington and Edgware Road. Please use CIRCLE LINE services instead.

This page shows the latest District line status, plus reliability trends based on observed service history. Set up free alerts on the homepage to get emailed when the status changes.

District Line Performance Summary

Last 24 hours

In the last 24 hours (), the District line came in at 27.5% good service - really rather poor. The weekly figure of 62.8% was more encouraging.

Last 7 days

Over the seven days to , the District line worked out at 62.8% reliability across all hours - quite poor. During peak hours, reliability was slightly higher at 87.9%. Based on the last 90 days, Mondays have been the strongest day (80.0%), with Sundays typically the worst (51.8%).

Last 30 days

Across the past month, from to , the District line averaged 75.1% - broadly average, and ranked 15th out of 20, in the lower half. During peak hours, reliability came in at 83.3%, edging slightly above the all-hours figure.

Last year

Over the last year ( to ), the District line has ranked 17th out of 20 lines with 68.4% reliability, near the bottom.

How we calculate these figures Get free District line delay alerts →

District Line Performance and Reliability Data

Detailed charts showing how the District line has performed over different time periods. All reliability figures are time-weighted and exclude normal overnight closures.

District line service status: last 24 hours

Every status change on the District line in the past 24 hours, from Good Service through to suspensions and closures.

District line status distribution: last 7 days

How operational time was split between service statuses over the past week. This shows status distribution, not the reliability figure (which excludes planned closures and overnight closures).

District line monthly reliability trend

Month-by-month reliability percentage showing long-term performance patterns and seasonal trends.

District line reliability by hour of day

Average reliability for each hour of the day, based on 60 days of monitoring. Helps identify the best and worst travel times.

District line reliability by day of week

Over the last 90 days, the District line has performed best on Mondays (80%) and worst on Sundays (51.8%).

District line typical station busyness

How busy stations on the District line typically are throughout the day, based on TfL crowding data. 100% = the single busiest hour of the week.

Recent status changes

  • Part Closure DISTRICT LINE: Saturday 14 and Sunday 15 March, no service between High Street Kensington and Edgware Road. Please use CIRCLE LINE services …
  • Good Service
  • Service Closed
  • Good Service
  • Minor Delays
  • Good Service
  • Minor Delays

How we calculate reliability

  • Time-weighted: Reliability is the percentage of operational time with “Good Service”, not a count of incidents. A 23-hour good day with a 1-hour delay scores ~96%, not 50%.
  • Operational hours only: Normal overnight closures (“Service Closed”) and planned closures are excluded so they don’t deflate scores.
  • Status change tracking: We record every status change from the TfL API (polled every 60 seconds), then calculate the duration of each status period.
  • Peak hours: Peak-hour figures cover weekday mornings (07:00-09:30) and evenings (16:30-19:00) only. All-hours figures include the full operational day.
  • Refresh frequency: Statistics on this page are recalculated every 5 minutes. Day-of-week patterns are based on the last 90 days of data.
  • Data source: All data comes from the Transport for London Unified API.
  • New lines: DLR, Elizabeth line, and Tram were recently added to our monitoring. Annual statistics for these lines will become available once a full year of data has been collected.

Need accessibility info? Check step-free access alerts for live lift status at stations on this line.

You can embed a live Tube status widget on your own website or intranet for free - shows real-time line status with auto-refresh.

See what happens to journey times if the District goes down - try our interactive travel time map.

About the District line

The District line is the green octopus, branching all over the place, and connecting a huge chunk of west and east London. It's essential, but the sheer sprawl means one issue can ripple into a lot of the timetable. It's also your go-to for Wimbledon, Richmond riverside, and Kew Gardens days out. Check live updates, especially at weekends.